Contact Us

"At Northwest Divers You Receive Professional Technical Services"

 

 

 

 

 

 

  TANK INSPECTION PROGRAM  

PARTS

 

LABOR

  Internal & External Inspection (steel only)       10.00
  Visual Plus Internal & External (aluminum only)       18.00
  Tank Tumble 1/2" Opening       40.00
  Tank Tumble 3/4" Opening       35.00
  Hydrostatic Test       26.00
  Hydrostatic Test (tank pressure over 3000 psi)       35.00
  Air Fill  

5.00

   
           
  VALVE OVERHAUL  

PARTS

 

LABOR

  K Valve       9.00
  J Valve       11.00
  Twin Manifold K Valve       15.00
  Twin Manifold J Valve       17.00
  Valve With Stem Gauge  

add

  3.00
           
  REGULATOR OVERHAUL  

PARTS

 

LABOR

  Single Hose (others)       35.00
  Single Hose With Octopus  

add

  12.00
  Environmentally Protected First Stage  

add

  7.00
  Alternate Inflation Regulator       20.00
  Octopus 2nd Stage       12.00
  Double Hose       50.00
  Power Inflator       8.00
  Acid Bath       10.00
           
  DRYSUIT REPAIR  

PARTS

 

LABOR

  Clean & Lube Inlet Or Exhaust Valve       25.00
  Drysuit Leak Test       55.00
  Leak Puncture Repair (per leak or puncture)       4.00
  Seams (per foot of seam)       15.00
  Replace Wrist Seal (latex)   19.00   20.00
  Replace Both Wrist Seals (latex)   38.00   30.00
  Replace Neck Seal (latex)   42.00   36.00
  Replace Wrist Seal (neoprene)   19.00   25.00
  Replace Neck Seal (neoprene)   42.00   40.00
  Custom Work Rate   per hour   35.00